Toa Payoh MRT Station (29 July 2017)
Toa Payoh MRT Station 
(GPS: 1.33343, 103.84736; NS19) is a subway station of the
Singapore MRT in
Toa Payoh. The station is served by the
North-South Line. It began operations on 7 November, 1987.
The Toa Payoh MRT Station was the first mass rapid transit station to be completed, with its topping up ceremony on 5 August, 1985, when it became the first subway station in the world to be installed with platform screen doors. It was also one of the first stations that went into operations with the Singapore MRT began running in 1987.
Serving the Toa Payoh area between
Novena MRT Station and
Braddell MRT Station, the Toa Payoh MRT Station is adjacent to the Toa Payoh Bus Interchange.
Toa Payoh MRT Station (29 July 2017)
Copyright ©
2003-2025 Timothy Tye. All Rights Reserved.